Solar Guidelines and Application

NOVEMBER 2019 UPDATE:  WE WILL CONTINUE TO ACCEPT APPLICATIONS FOR NEM1.0 UNTIL DECEMBER 31, 2019. 

EFFECTIVE JANUARY 1, 2020, ALL APPLICATIONS SUBMITTED WILL BE SUBJECT TO NET ENERGY METERING 2.0 (NEM2.0).

 

Information pertaining to NEM 2.0 can be found here: NEM 2.0 INFORMATION

A copy of the NEM 2.0 rate schedule can be downloaded using this link:  ELECTRIC SERVICE SCHEDULE NEM 2.0

SOLAR REBATES HAVE BEEN FULLY SUBSCRIBED.  AT THIS TIME THERE ARE NO MORE REBATES AVAILABLE FOR INSTALLING SOLAR.

Application Process:

1. Submit application, net metering agreement, interconnection agreement, a single line diagram, net metering equipment specifications sheet, and a copy of the system contract and/or sales proposal.  A $600 application fee will also be required.

2. MID will review the application packet.

3. A pre-construction meeting will be scheduled on site prior to the system installation.

4.  MID will issue approval to move forward with construction upon completion of the meeting if all other requirements are satisfied.

5. MID will perform the MID PV inspection (after the City/County Code inspection).

6. MID will have meter placed for new PV system.

7. MID will establish a customer-generator electric utility account pursuant to the Photovoltaic Interconnection Agreement and issue Permission to Operate (PTO) to the customer.

You can access and download the Photovoltaic System Application  HERE.

 


QUESTIONS:

Customer Programs Manager
744 W. 20th Street, Merced, CA  95340
PHONE:   (209) 354-2819
FAX:  (209) 726-7010
E-MAIL:  rebates@mercedid.org

©2020 Default | Technical contact: helpdesk@mercedid.org | Privacy Policy